Process PROFI performance

Step 1: building inspector records
Possible written comments of the inspector: "There is a crack at point XY, x mm wide and y cm long" to "Concrete has flaked off at point XY and the reinforcement is probably attacked by groundwater".

Step 2: categorization via text mining by PROFI AG
  • Nature of the damage
  • Place
  • Affected component
  • Possible (!) causes
  • Soil descriptions according to groundwater aggressiveness
  • Soil type, Soil density, etc.

Result:
Relationships are created by relating the data structured by text mining with other data and finding correlations.

Joint
Bearing
Drone
Stalactite
Connection joint
Chipping
Abutment