ibk IngenieurConsult
A Future-Proof Solution Thanks to Hyperconvergence
ibk IngenieurConsult
For four decades, ibk IngenieurConsult has been providing innovative solutions in fixture and plant engineering for the automotive and aerospace industries, as well as for small and medium-sized businesses.
Initial Situation and Objectives
The IT infrastructure at ibk IngenieurConsult in Hanover could no longer be operated with a reasonable administrative workload. Over the years, the individual hardware components of the data center had grown into a heterogeneous conglomerate that offered neither the desired ease of management nor the necessary operational reliability. “The entire system had simply reached its limits,” explains Henning Wolf, Deputy IT Manager at ibk IngenieurConsult.
“A partial modernization alone would not have changed much about this fundamental situation.” Consequently, it was decided to replace the outdated, fragmented server landscape with a future-proof IT solution. “The goal was the stable operation of a virtual infrastructure,” says Henning Wolf, describing the approach. The decision to opt for an on-premises data center solution was made early on.
Other deployment models, such as a hybrid IT platform or Infrastructure-as-a-Service (IaaS) from the cloud, were ruled out early in the project.
“The hyperconverged configuration consisting of Dell VxRail servers as a high-availability cluster proved to be the most sensible solution, both technically and economically.”
Henning Wolf, Deputy IT Director, ibk IngenieurConsult
The Solution
When designing the new data center, the team opted for a hyperconverged configuration consisting of a Dell VxRail system with six nodes configured as a high-availability cluster. “It turned out to be the most sensible solution, both technically and economically,” summarizes Henning Wolf. The six nodes were distributed across two internal data centers and integrated into the network via four redundant Dell switches.
The systems are managed via VMware vSphere as a middleware layer. “We were able to draw on both existing licenses and the experience we’d already gained with VMware,” explains Wolf. This also simplified the implementation of the cluster system, which was completed within a month. In total, the entire project required only 12 person-weeks. “Migrating the virtual machines and transferring data from the legacy systems took longer than setting up the new data centers,” Wolf says with a smile. The only hiccup was an expired certificate on a switch, which temporarily brought the entire system to a standstill. Since the cause was unusual and difficult to pinpoint, Dell Support took over troubleshooting and quickly identified the culprit.
PROFI’s Contribution
PROFI AG supported the project both in evaluating potential solutions and in implementing the selected data center configuration.
“We had a finely coordinated division of labor between Dell Technologies, the customer, and us,” explains Yavuz Ölcgen, sales representative at PROFI AG. “So it’s no wonder that the evaluation and implementation of the new solution went practically without a hitch.” Henning Wolf adds: “The support from our IT partner was invaluable at every stage. This made it possible to successfully complete the project within just a few weeks.”
“Thanks to the finely tuned division of labor between Dell Technologies, the customer, and PROFI AG, it was no surprise that the evaluation and implementation of the new solution went virtually without a hitch.”
Yavuz Ölcgen, Sales Representative at PROFI AG
“The support provided by PROFI AG was extremely valuable at every stage. This made it possible to successfully complete the project within a few weeks.”
Henning Wolf, Deputy IT Director, ibk IngenieurConsult
Customer Benefits
- High operational reliability through the splitting of clusters across two geographically redundant data centers
- Software-defined management of VxRail systems via VMware vSphere
- Hyperconverged cluster infrastructure with significantly reduced administrative overhead
- Future-proof solution thanks to a cost-effective IT system
Technical Details
- Dell All-Flash Hyperconverged Stretched Cluster System
- VxRail P570 with six nodes configured as a high-availability cluster, distributed across two internal data centers
- Four redundant Dell EMC S4128F switches
- VMware vSphere as the middleware layer for system management
